20 years of experienceIllustrative imageIn our clients' words, on Google
“Special thanks to Engineer Abdulbari for his understanding and his supervision.”
5.0 from 30 Google reviews
Can your lift keep up with your building?
In an office building at peak hour, or a residential block when residents return in the evening, a lift that was never planned around that traffic becomes a daily burden. Long waits at the doors, a cramped cabin, a speed that does not suit the number of floors: these are costs your building's occupants absorb every single day.
The right passenger lift is not picked from a catalogue. The process starts with measuring the shaft and studying how your occupants move and when, then settling on speed, capacity and the number of lifts if the building calls for it, and finishing with a cabin design that matches the building's standard.
Components chosen around your building
- Selecting the right speed and capacity
- Cabin design and interior finishes
- Door installation and safety devices
- Traffic planning for the building
From traffic analysis to commissioned lift
Tell us about your building
The number of floors, whether it is residential or office use and the proposed shaft location.
Site visit and assessment
Our team measures the shaft and studies user flow to determine the options that suit your building.
Presenting solutions and specifications
We propose speed and cabin options and the number of lifts if needed, and you choose what suits you.
Installation and follow-up
We install and test the lift, then follow up on its performance after handover under 2 years free warranty on the lift, covering spare parts and the periodic maintenance during that period.
From our work




Why us
We analyse occupant traffic at peak hours for each building individually, then decide on speed and number of lifts accordingly.
- 13+ years
Lifts we installed that are still running, fault free.
- 300+
Clients served.
- 2 years free warranty
On the lift, covering spare parts and the periodic maintenance during that period.
20 year warranty on the lift machine.
Does your building traffic call for this lift?
Multi-storey office tower
Morning peak traffic demands careful planning of speed and the number of lifts; the site visit decides the right specification.
Mid-rise residential block
Steady, spread-out use allows a wider range of speed options, and the cabin finish is matched to the building's standard.
Existing building, no lift
Whether installation is feasible depends on available space and structural changes needed; only the site visit can confirm what is possible.
Warranty and follow-up after the first run

On-site follow-up
- Our team follows up on performance after handover
- Any observation is reported and addressed
- 20 year warranty on the lift machine

What to expect going forward
- Periodic maintenance based on the lift's condition
- Spare parts whenever the lift requires them
- Direct contact with the technical team
What building owners weigh before buying
What affects the cost of a passenger elevator?
Several factors shape the price: the speed required, the cabin dimensions, the level of interior finish, the number of stops and any civil works the shaft needs. No figure can be given before a site visit and actual shaft measurements.
What can residents and staff expect while the passenger lift is being installed?
This varies from one building to another depending on whether the building is new or existing and how ready the civil works are. In existing buildings the shaft works may require coordination across floors. The site visit determines the scope and the actual level of disruption.
Will installation cause noise or dust that disturbs the occupants?
Shaft work and connections do generate some noise and dust; that is true of any installation project. The extent depends on the building and how prepared the shaft is. We explain exactly what to expect after the site assessment.
How can I be sure the building's occupants are safe during and after installation?
During installation the work area is isolated to protect occupants moving through the building. On completion the full system undergoes performance and safety testing before handover. Exactly what is tested and handed over is defined precisely during the site visit and design stage.
How do I judge a lift company before awarding the project?
Ask how they analyse building traffic and how they justify their choice of speed or number of lifts. A company that asks you questions before proposing a specification is more trustworthy than one that quotes a figure before seeing the site.
Related services
All our servicesQuestions about passenger elevators
How do I know how many lifts my building needs?
It depends on how the building is used, what its peak hours look like and how passengers move between floors. There is no single answer for every project; we weigh all of this during the site visit and advise accordingly.
Does a residential building need a different speed from an office building?
Usually yes. Office buildings see heavy traffic at peak hours and need faster response, while residential buildings tend to have steadier flow. The site visit determines the exact specification.
What cabin finish options are available?
Options include wall materials, glass panels, floor surfaces, lighting and control panels. We present the available choices once the lift type and specifications are confirmed on site.
Can a passenger elevator be installed in an existing building?
Yes in many cases, but the requirements vary from one building to another depending on available space and the structural changes needed. We need a site visit to assess the situation and tell you what is possible.
Can the machine room be positioned to suit our building, or can it be omitted altogether?
It depends on the lift type chosen, the shaft dimensions and the building's structural constraints. Some systems require no separate machine room; others do. The site visit determines which option suits your building.
Can the cabin be built to a non-standard size to fit a narrow shaft?
In many cases the cabin dimensions can be adapted to fit the available shaft, though this affects capacity and the finish options possible. The site visit measures the shaft and confirms what is genuinely achievable.
How is installation coordinated with the main contractor during construction?
Early coordination with the main contractor is needed to ensure the shaft dimensions are correct and civil works are ready before installation begins. We set out the coordination requirements in detail after the site visit.
Passenger elevators in Riyadh, Al Kharj and Al Muzahimiyah
Start with your building traffic
Tell us the building's layout, its floors and its location; we study how people move through it, visit the site, then quote.
0532267955العربية


















