20 years of experienceIllustrative imageEscalators & moving walks in New International Airport, Makkah Region
At New International Airport, Makkah Region, Adaa Elevators maintains escalators and moving walks to ensure safe passage for thousands of daily visitors. Our comprehensive inspection meets international safety standards before each operation.
5.0 from 30 Google reviews
In our clients' words, on Google
“Courteous dealings, for years now.”
5.0 from 30 Google reviews
Are visitors bunching at every floor entrance?
For anyone who owns or manages a building in New International Airport, Makkah Region: a summary of what our escalators & moving walks service covers.
When foot traffic slows at transition points between floors, visitors lose time and nearby retailers lose revenue. An escalator sized without reference to actual site conditions, or a moving walk placed in the wrong corridor, turns a circulation asset into a daily bottleneck.
What your escalator installation includes
- Speed and safety device calibration
- Supply of escalator and walk units
- Scheduled maintenance after handover
Escalators & moving walks in New International Airport, step by step
Contact us with your needs
Site visit and survey
Quotation and specification
Installation, handover and follow-up
From our work




Why us
We calibrate every safety device against the foot traffic your site actually carries, not against a generic specification.
- 13+ years
Lifts we installed that are still running, fault free.
- 300+
Clients served.
- 2 years free warranty
On the lift, covering spare parts and the periodic maintenance during that period.
20 year warranty on the lift machine.
Escalators & moving walks in New International Airport: the right fit for you?
Long internal horizontal corridors
A moving walk reduces pedestrian fatigue along long corridors; the gradient and width are confirmed only after the site is measured.
Existing escalators needing replacement
We inspect existing units and advise whether full replacement is necessary or whether spare parts and recalibration are sufficient.
Escalators & moving walks in New International Airport: after the job

First follow-up
- Motor performance and speed review
- Safety device test after first operation

Ongoing maintenance
- Steps, chains and combs inspected
- Unit condition report after every visit
Honest answers before you fit an escalator
What should I look for when choosing a contractor for a busy commercial escalator installation?
Ask the team to explain how they assess foot traffic loads, how they handle existing structural openings and what the post-handover maintenance programme actually includes. A capable company answers in specifics because it has worked through these decisions on real sites.
How long will the floor be closed to visitors during installation?
This depends on how complete the structural opening is, the state of the electrical supply and the scope of any adjustments needed. The site visit determines the work sequence and what can be done without a full closure.
Escalators & moving walks in New International Airport: common questions
Can you service equipment at a major airport facility?
Yes, our team services New International Airport and understands major facility requirements and high-flow operations. We coordinate with airport management to minimise disruption during inspections.
What safety standards do you apply at the airport?
We apply strict safety standards suited to airport facilities and high-traffic venues. Every inspection covers motion safety, step integrity and all security systems fully, and we record all findings to track maintenance history.
What spare parts do you stock for after-installation support?
We stock parts including steps, chains, combs, sensors and selected control panel components. What your site specifically requires is identified at the initial survey and documented in the maintenance plan.
What happens if an escalator stops suddenly during peak hours?
The escalator is designed to stop safely and become a static stairway that visitors can walk on. We investigate the cause at the assessment visit and determine whether the fix requires spare parts or recalibration.
Can you install escalators in a building under construction as well as a completed one?
Yes, but preparation requirements differ. In buildings under construction the openings can be designed to the correct dimensions; in completed buildings the site visit determines whether the space is suitable and what adjustments are needed before installation.
What sets New International Airport apart
New International Airport is a large modern facility with multiple floors and intense daily passenger flow, relying heavily on escalators and moving walks for crowd movement. High-traffic venues like this demand strict maintenance and careful inspection, since any fault affects thousands of passengers. The airport's equipment is modern and needs regular monitoring to maintain reliable performance and continuous safety.
New International Airport sits in Makkah Region and is a large modern facility designed for high passenger flow.
The airport's modern escalators and walks operate at very high intensity with thousands of daily passengers, requiring precise maintenance and frequent inspection.
Nearby places we also serve in Makkah Region: Technology Oasis, Adwan and Sulaba.
More areas for escalators & moving walks
Other services in New International Airport
Tell us where your escalator will go
Send us your district in New International Airport and a photo of the lift on WhatsApp, and we will arrange the next step with you.
0532267955العربية







