العربية 0532267955العربية
0532267955العربية
Marble-framed landing door with cabin visible20 years of experience
Survey · Supply · Hand over

Elevator supply & installation in New International Airport, Makkah Region

Around the New International Airport in Makkah, Adaa Elevators supplies and installs lifts for major commercial and residential projects. We work with complex engineering drawings and high specs to ensure quality and reliability.

5.0 from 30 Google reviews

In our clients' words, on Google

“High quality, quick delivery, competitive prices and a great job.”
Anmar, March 2026Translated from Arabic

5.0 from 30 Google reviews

Read the reviews on Google Maps

Why do elevator projects stall?

These are the details of our elevator supply & installation service for building owners in New International Airport and nearby places in Makkah Region.

Many building owners discover too late that the shaft does not match what was drawn, or that the specification they agreed does not suit the actual floor count or use. The result is delays, costly adjustments, and sometimes a lift that never quite does what the building needs.

Related to elevator supply & installation in New International Airport: Hydraulic elevator installation and External elevator installation.

Supply and installation from shaft to cabin

  • Selecting machine, cabin and doors
  • Site survey and shaft assessment
  • Full installation and systems testing

From the first message to the finished job in New International Airport

  1. Contact us about your building

  2. We visit and survey

  3. We supply and install

  4. We test and hand over

Take the first step

From our work

  • Underslung cabin installation, shaft view with guide rails
  • Home lift steel frame assembled in the stairwell, before cladding
  • Gold-finish cabin with mirror walls
  • Home lift steel frame door frame fitted
  • Gold mirror landing doors in a decorated hall
  • Technician fitting the cabin in a glass shaft
  • Counterweight on its guide rails with buffers at the bottom of the shaft, underslung installation
  • Glass-door cabin with wood walls and marble floor
Contact us

Why us

We inspect the actual shaft ourselves before specifying the machine or doors, so costly adjustments do not surface once installation has begun.

Is your building ready for this service?

  1. Commercial or mixed-use building

    Door configurations, traffic patterns and controller requirements differ from residential use; the site visit establishes what the building actually needs.

  2. Building under construction with shaft ready

    If the shaft is still being designed, an early visit sets the correct dimensions before pouring and avoids costly alterations later.

What comes after the job in New International Airport

What building owners weigh before buying new

  • Will there be excavation or building works that damage the property?

    Installation involves works inside the shaft, at each landing, and sometimes in the machine room. The extent of those works and what protection neighbouring areas need is assessed during the site survey. Areas unrelated to the lift installation are kept clear of any impact.

  • How can I be sure the elevator is safe for my family or building occupants after installation?

    Before handover we run a full performance check on every system: doors, sensors, controller and safety devices. The elevator is not handed over until those tests confirm everything is working correctly. A follow-up visit after the lift is in use then verifies real-world performance.

Questions and answers: elevator supply & installation in New International Airport

How do you handle large and complex projects?

We start with detailed analysis of engineering plans and high specifications, working with the project team to ensure complete coordination across all systems.

Do you have experience with large hotels and shopping malls?

Yes, we supply and install lifts for major commercial and hotel projects, with each receiving the advanced study and planning it warrants.

What are the differences between available machine types and which suits my building?

Machine types differ in how they are installed, the overhead clearance they need and whether a machine room is required. There is no single answer; our technician reviews your building and explains the available options based on shaft dimensions, floors and use.

Do you work in my city?

Yes. We serve all regions of Saudi Arabia. Send us your project's exact location and we will arrange the site visit.

Can the elevator be installed in a building that is still under construction?

Yes, we can coordinate with the construction phase to ensure the shaft is built to the correct dimensions before pouring. An early site visit establishes shaft requirements and the right installation timing to fit your build programme.

What sets New International Airport apart

Projects around the New International Airport are large-scale, including luxury hotels, high-rise residential blocks and shopping malls, all requiring strict building standards and advanced engineering design. Shafts here are deep and wide, needing multi-unit lift systems, and specs are precise because buildings are often international projects. The team works with 3D drawings and detailed plans, ensuring compatibility with all building systems.

The New International Airport area in Makkah is a major development zone with luxury hotels, high-rise blocks and shopping malls built to very high standards.

Large projects around the airport typically require multi-lift systems at varying heights and high capacities, with complex designs calling for precise survey and advanced planning.

We also provide elevator supply & installation near New International Airport, in places such as Technology Oasis, Adwan and Sulaba.

Elevator supply & installation: the full service

Begin with a visit to your building

Send us your district in New International Airport and a photo of the lift on WhatsApp, and we will arrange the next step with you.

Call now WhatsApp