20 years of experienceElevator supply & installation in Al Sour, Makkah Region
In Al Sour, Makkah Region, elevator supply and installation covers the initial survey of completed buildings and full installation from foundation to handover. Adaa Elevators manages the entire project from survey through commissioning.
5.0 from 30 Google reviews
In our clients' words, on Google
“The work is excellent and neat, and they keep their word.”
5.0 from 30 Google reviews
What a request for elevator supply & installation in Al Sour includes
We serve all regions of Saudi Arabia, Al Sour in Makkah Region among them. Below is what a request for elevator supply & installation covers.
The team visits your site and physically examines the shaft: overhead and pit clearances, floor count, how the building will be used. From that they recommend the right machine, cabin and doors. Once agreed, we deliver the equipment, install it, connect the electrical systems and controller, then hand over a tested, ready-to-run elevator. One method we install is underslung: the cabin is supported from underneath by a rope and pulley traction arrangement and travels between guide rails on both sides. A counterweight on its own guide rails balances the cabin's weight, and buffers fixed at the bottom of the shaft absorb the impact if the cabin or counterweight runs past its lowest stop.
Related to elevator supply & installation in Al Sour: Panoramic elevator installation and Home elevator installation.
Supply and installation from shaft to cabin
- Selecting machine, cabin and doors
- Full installation and systems testing
- Testing, then formal handover
Elevator supply & installation in Al Sour, step by step
Contact us about your building
We visit and survey
We supply and install
We test and hand over
Photos of our work

Why us
We inspect the actual shaft ourselves before specifying the machine or doors, so costly adjustments do not surface once installation has begun.
- 13+ years
Lifts we installed that are still running, fault free.
- 300+
Clients served.
- 2 years free warranty
On the lift, covering spare parts and the periodic maintenance during that period.
20 year warranty on the lift machine.
Is your building ready for this service?
Multi-storey residential building
We assess the shaft and select the machine and cabin to suit the floor count and occupancy; the site visit decides the exact specification.
Commercial or mixed-use building
Door configurations, traffic patterns and controller requirements differ from residential use; the site visit establishes what the building actually needs.
What comes after the job in Al Sour

Post-installation follow-up
- Scheduled periodic maintenance
- A follow-up visit once the lift is running

What to watch for
- Door performance and floor-levelling accuracy
- Control panel response
What building owners weigh before buying new
How can I be sure the elevator is safe for my family or building occupants after installation?
Before handover we run a full performance check on every system: doors, sensors, controller and safety devices. The elevator is not handed over until those tests confirm everything is working correctly. A follow-up visit after the lift is in use then verifies real-world performance.
Will there be excavation or building works that damage the property?
Installation involves works inside the shaft, at each landing, and sometimes in the machine room. The extent of those works and what protection neighbouring areas need is assessed during the site survey. Areas unrelated to the lift installation are kept clear of any impact.
Questions and answers: elevator supply & installation in Al Sour
Our building is complete and we need a lift, where do we start?
We start with a site survey to assess the shaft, pit, height and clearances, then recommend the right solution and installation timeline.
Can you install if the concrete frame is very newly cast?
Yes, but we first confirm the concrete has cured properly and the openings are at correct dimensions. The survey establishes this.
How do you handle differences between the drawn shaft dimensions and what was actually built?
This is one of the key things the site visit reveals. If we find a gap between the drawings and the built shaft, we document it and recommend the right solution before supply or installation begins, avoiding problems later.
What warranty comes with a lift you install?
2 years free warranty on the lift, covering spare parts and the periodic maintenance during that period. 20 year warranty on the lift machine.
How do you choose the right specifications for my building?
Our technician visits and examines the shaft dimensions, the overhead and pit clearances, the number of floors and how the building will be used. From that we recommend the most suitable machine, cabin and doors, rather than applying a one-size-fits-all specification.
What sets Al Sour apart
Al Sour contains a mix of villas, residential blocks and small shops, with many new projects where the concrete frame is ready awaiting lift installation. Supply and installation here begins with surveying the available shaft space, adjacent columns and pit position, then planning installation suited to the building height and site access. Coordination with the builder or developer is essential to confirm the space matches specifications before work starts.
Al Sour sits in Makkah Region and is a diverse building area mixing modern villas, residential blocks and small commercial facilities.
Shaft spaces and pit dimensions in new projects at Al Sour vary by building design, and the initial survey determines the right installation approach for each site.
We also provide elevator supply & installation near Al Sour, in places such as Ar Rumaydah, Al Lahyan and Sur.
More areas for elevator supply & installation
Begin with a visit to your building
Call or message us on WhatsApp, tell us where you are in Al Sour and the state of the lift, and we will arrange the site visit.
0532267955العربية







