20 years of experienceIn our clients' words, on Google
“I recommend them for installation. We have passed 7 years, thank God everything is fine, and the maintenance is fast.”
5.0 from 30 Google reviews
Worried you will only see the problem once it is built?
Asking about elevator design in Al Kandarah starts with a call or a WhatsApp message, and below is what the work covers.
Many people find the cabin is narrower than expected, the finishes clash with the building's interior, or the control panel is awkwardly placed, but they find this out after installation. Changing what has already been built is far harder than approving the right drawing from the start.
What your cabin design drawing includes
- Cabin dimensions and space layout
- Wall, floor and ceiling finishes
- Door type and opening mechanism
From first brief to finished drawing
Contact us with building details
Site visit and measurement
Preparing the design and drawings
Your approval then supply
From our work








Why us
We fix the control panel position and door opening direction in the approved drawings and do not alter either of them during installation.
- 13+ years
Lifts we installed that are still running, fault free.
- 300+
Clients served.
- 2 years free warranty
On the lift, covering spare parts and the periodic maintenance during that period.
20 year warranty on the lift machine.
Does cabin design suit your project?
Villa with limited space
Available space shapes every cabin and door option; the site visit determines what is workable and what is not.
Existing building needing a new lift
We review the existing shaft and design the cabin and finishes around current constraints and the building's architectural character.
Elevator design in Al Kandarah: after the job

Moving to supply
- Any change discussed before ordering
- No materials ordered without your sign-off

Installation and follow-up
- 20 year warranty on the lift machine
- Technicians work to the approved drawings
Honest answers about the design process
Does preparing the drawings cause noise or excavation works?
No. The design stage involves no physical works inside the building beyond measurement and inspection. Construction does not begin until the design is fully approved and the project moves to supply and installation.
How do I judge the quality of the design a company presents?
Look at how detailed the drawings are: do they clearly show exact dimensions, finishes, door positions, control panel placement and lighting layout? And do they let you compare options before deciding? A vague drawing is a sign of vague execution.
Elevator design in Al Kandarah: common questions
Our plot is large, where is the best place for the shaft?
It depends on the villa or block layout, entrances and power supplies. We work with engineers on the plans to choose a shaft position that serves all floors efficiently and allows easy maintenance.
Does planning on paper reveal issues we would only see after building?
Yes, often. Planning shows issues with power location, soil depth or cable routes before you build, letting you avoid costly rework.
What happens if I want to change the design after approving it?
Changes can be discussed before supply and installation begin. The earlier the change, the easier it is to accommodate, which is why we allow enough time for review before any final approval.
How many finish options do you present and how do I compare them?
We present a range of options covering walls, floor, ceiling and lighting during the design stage. Each option is shown in the drawings so you can compare visually before making any final decision.
Can you design a lift for a villa with a shallow pit or limited space?
It depends on the actual site measurements. After the visit we establish whether the available space allows a workable design, then propose options that fit the villa's structural constraints.
What sets Al Kandarah apart
Al Kandarah has multi-storey apartment blocks and luxury villas on relatively large plots, plus some commercial projects. Large plots offer more shaft location choices, but need tighter planning since too many options can lead to poor choices. Planning the lift with the engineering team ensures the shaft, power and corridors are in the best place for daily use and maintenance.
Al Kandarah is in Makkah Region, an area mixing apartment blocks and luxury villas on spacious plots.
Large plot sizes mean more shaft location options, requiring a precise land survey and drawings to choose the best position.
If you are close to Al Kandarah, in Al Baghdadiyah Ash Sharqiyah, Al Ammariyah or As Sabil, the same service is open to you.
More areas for elevator design
Book your design brief session
To ask for elevator design in Al Kandarah, call us or send a WhatsApp message, and we will answer your questions before any step.
0532267955العربية







