العربية 0532267955العربية
0532267955العربية
Illustration: lift control cabinet with boards and wiring20 years of experienceIllustrative image
Diagnose · Replace · Tune

Control system upgrades in New International Airport, Makkah Region

At New International Airport, Makkah Region, upgrading control systems in service and passenger lifts improves performance and reliability. A modern inverter system ensures smooth operation without unexpected halts.

5.0 from 30 Google reviews

In our clients' words, on Google

“Flawless work. I truly recommend them.”
Aziz, June 2026Translated from Arabic

5.0 from 30 Google reviews

Read the reviews on Google Maps

Control system upgrades in New International Airport: what it includes

If you are in New International Airport, Makkah Region, and looking for control system upgrades, this is what is worth knowing before you contact us.

The technician removes the existing control board and fits a modern unit selected to match your lift's current structure and motor. A new inverter drive is wired in to ramp speed gradually at start and stop. Floor-level alignment is then set precisely at every landing and a diagnostics system is activated to log fault codes automatically. The lift is handed back with a ride that every user will notice.

Controller components being replaced

  • Installing a new inverter drive
  • Replacing the old control unit
  • Activating the fault diagnostics system

How controller replacement unfolds

  1. Tell us about your lift

  2. On-site assessment visit

  3. We present your tailored proposal

  4. Installation, tuning and handover

Take the first step

From our work

  • Cabin with patterned steel pillars and cut-out ceiling
  • Cabin with lattice ceiling and wood panelling, technician beside the door
  • Gold mirror landing doors in a decorated hall
  • Cabin with cut-pattern steel, burl wood panels and button panel
  • Machine area with steel columns, blue motor and ropes
  • Black marble surround with mirror-steel cabin and wavy panels
  • Cabin keypad and button panel on cut-pattern steel
  • Lift enclosure in a modern hall with tinted glass door and floor LED lights
Contact us

Why us

We select the new control unit to match your existing lift structure and motor, then tune the inverter speed curve until the cabin stops flush at every floor.

Cases that call for control system upgrades in New International Airport

  1. Poor floor levelling

    Inaccurate levelling often points to the control system; the exact cause is confirmed during the site visit.

  2. Vibration at start or stop

    An inverter drive ramps speed gradually and removes vibration in most cases, depending on the motor condition.

After the inverter drive is running

Honest answers before you replace the controller

  • Is the lift safe to use the moment installation finishes?

    The lift is not released for use until levelling is set, the inverter speed curve is tested and door signals are verified. If any constraint affecting safety appears in the inspection it is stated plainly in the proposal before work begins.

  • Will the work cause noise or dust in the building?

    Work is confined to the machine room, control enclosure and cable runs inside the shaft, and does not extend to landing floors or shared corridors. The level of disruption depends on where the machine room sits and the wiring layout, which the technician maps during the visit.

Questions and answers: control system upgrades in New International Airport

Does upgrading reduce emergency lift stoppages in an airport environment?

Yes, the modern system provides superior control and quick response to changing loads, reducing unexpected stoppages in high-use environments like airports.

Can the upgrade be done with minimal service interruption?

Upgrading lifts at an airport requires careful planning. We work with airport management to schedule upgrades when passenger flow impact is minimised.

Does the diagnostics system make future maintenance easier?

Yes. The system logs fault codes as they occur and displays them to the technician instead of requiring manual fault-finding. This shortens diagnosis time and makes each maintenance visit more precise.

Can the controller be upgraded without changing the rest of the lift?

In many cases yes, because the new system is selected to match the existing structure and machine. It depends on the condition of the wiring and motor, and compatibility is confirmed during the assessment visit.

Does the lift have to be taken out of service for the entire installation period?

Yes, the lift must be taken out of service while the controller is replaced and the new drive is wired in. How long this takes depends on the complexity of the existing wiring and the motor condition, and is confirmed after the assessment visit.

What sets New International Airport apart

New International Airport has multi-storey buildings with passenger and service lifts running at very high capacity continuously. These lifts serve thousands of visitors and staff daily, meaning constant unbroken use. Electrical controllers in this high-pressure environment need high efficiency and absolute reliability. Upgrading to a modern inverter system provides this stability and safety, reducing emergency stops that disrupt passenger flow.

New International Airport in Makkah Region is a modern multi-storey complex with high-use service and passenger lifts.

Lifts in airports and large complexes operate under very high usage loads, and system upgrades improve stability and reliability throughout the day.

We also provide control system upgrades near New International Airport, in places such as Technology Oasis, Adwan and Sulaba.

Control system upgrades: the full service

Ask for control system upgrades in New International Airport

Send us your district in New International Airport and a photo of the lift on WhatsApp, and we will arrange the next step with you.

Call now WhatsApp